A small, privately owned Asian company is producing a private-label soft drink Y

ID: 400243 • Letter: A

Question

A small, privately owned Asian company is producing a private-label soft drink Yoggo. A bottling line puts the soft drinks into plastic bottles and then packages the bottles into boxes holding 10 bottles each. The bottling line is comprised of the following 4 steps 1. the bottling machine fills a bottle 2. the lid machine covers the bottle with a lid 3. a labeling machine places a label on a bottle, and 4. the packaging machine places a bottle into a box. The processing times for each of these steps are shown on the table below. When a box has been filled with 10 bottles, a worker tending the packaging machine removes the filled box and replaces it with an empty box. Assume unlimited demand and that the time for the worker to remove a filled box and replace it with an empty box is negligible and hence does not affect the capacity of the line Number of Seconds per machines ss step bottle ing y a lid abelin 4 ackagin a. What is the capacity (bottles/hour) at the resource Apply a lid"? b. What is the bottleneck in the process? c. Assuming unlimited demand, what would be the flow rate? d. Assuming unlimited demand, what would be the utilization at resource "Apply a 600 bottles per hour Packaging 10,800 86 3,373 bottles per hour percent lid"? e. How long would it take to produce 530 bottles assuming this is a machine- seconds paced process that starts empty?

Explanation / Answer

flow rate is the minimum of demand and process capacity.since demand is unlimited,we would consider process capacity. The process capacity is always equivalent to the capacity of the bottleneck.bottleneck is given to be packaging so capacity of packaging is the flow rate:

7 seconds per bottle

3600 seconds = 3600/7 bottle/hour

514 bottles

If the process starts empty then the time to produce 530 bottles= total processing time + (530-1)/flow rate

=7*530 +1.029

=3711 seconds