ID: 338971 • Letter: A
Question
As he production planner for Xangling Hu Froduets, Inc. you have been given a bill ofmrel or a bracket that is ade upf a base 2 springs, and 4 clamps. The base is assembied from 2 damps and 1 housing Each clamp has 1 handle and 1 casting Each housing has 1 beating and 2 shafts There is no invenory on hand Tris erercise cortains only parts bandc The produc structure is as followe: Brecket Ecst pring y Ciampe Carpa Casta bDeterminethe gross quantties needed of each item ifyou ae to aseble 75 brackets a nts (enteryour response as a whole number Sprng: ? t; ianter your response as whole number, Clamp:unice fontor your mepon a whoie umber Housingunits (onter your esponse a a whale number Handieunits feneryour rexponce ss a whole nmber) Casing:units enter your response ss a whole mumber). Beeing: units erter your response d whole number). htu ) Compute the net quantes needed if there are 30 of the base and 76 of te camp in stock Base Spreg units fenter your response as a whole number Clamp:unicsfenter your response asawole numben Housingunica fanter your reaponse as a wnoie number Handia unit fantor your apon as a whoila numban. asig:units (enter your epo whoie number. Bearing:units (enter your response as whole number. Shaft units fenter your response as a whole numbe units fenter your response as a whale number units fenter your responze ss a whale number).Explanation / Answer
Solution :
Part B :
Part C :
Item Quantity On-Hand Net Requirement Gross Requirement Bracket 0 75 75 Base 0 75 75 Spring 0 150 150 Clamp 0 450 450 Housing 0 75 75 Handle 0 450 450 Casting 0 450 450 Bearing 0 75 75 Shaft 0 150 150Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.