5. A bicycle manufacturer has updated its procedures for final assembly. Each of
ID: 3053891 • Letter: 5
Question
5. A bicycle manufacturer has updated its procedures for final assembly. Each of three different crews uses the old procedures for 3 days and then the new procedures for 3 days The outputs (in bicycles per hour) are shown in the table below. Does there appear to be an interaction between the crew and the procedure? Does there appear to be a difference in the mean outputs of the two procedures? Does the crew appear to affect the output? Based on these results, do the new procedures appear to increase output? Crew Old New I 16.8 17.4 15.4 18.1 19.4 18.3 II 16.5 15.3 16.9 17.5 17.8 17.6 III 16.0 14.8 18.1 16.6 16.4 17.6Explanation / Answer
Covert this table into an csv file with
column 1 = bicycle
column 2 = crew
column 3 = procedure
name the file as bicycle.csv
## loading the file in R
bicycle_df<- read.csv("bicycle.csv")
result <- aov(bicycle ~ crew*procedure, data = bicycle_df)
results
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.