Activity-Based Budget Macon Industries has the following budget information avai

ID: 2529136 • Letter: A

Question

Activity-Based Budget
Macon Industries has the following budget information available for February:


Use activity based costing to prepare a manufacturing cost budget for February. Clearly distinguish between unit, batch, and facility-level costs.

0.00 points out of 1.00

0.00 points out of 1.00

0.00 points out of 1.00

0.00 points out of 1.00

0.00 points out of 1.00

0.00 points out of 1.00

0.00 points out of 1.00

0.00 points out of 1.00

0.00 points out of 1.00

Units manufactured 25,000 Factory administration $60,000 Assembly 0.5 hour per unit X $13 Direct materials 2 pounds per unit X $5 Inspection $300 per batch of 1,000 units Manufacturing overhead $6 per unit Product development $20,000 Setup cost $16 per batch of 1,000 units

Explanation / Answer

Answer:-

Macon Industries Manufacturing Cost Budget For the Month of February Particulars Unit (1) Batch (1000 units) Manufactured (25000 units) $ $ $ Factory Administration $60000/25000 units =$2.4 per unit $2.4 per unit*1000 units =$2400 per batch 60000 Assembly .5 hour per unit*$13 =$6.5 per unit 6500 $6.5 per unit*25000 units=162500 Direct material cost 2 pounds per unit*$5 =$10 per unit 10000 $10 per unit*25000 units=250000 Inspection $7500/25000 units=$.30 per unit 300 25 batches*$300 per batch=7500 Manufacturing overhead 6 $6 per unit*1000 units=$6000 $6 per unit*25000 units=$150000 Product development $20000/25000 units =.80 per unit $.80 per unit*1000 units=800 20000 Setup cost $400/25000 units =$.016 per unit 16 25 batches*$16 per batch=400 Total Manufcaturing cost 26.016 26016 650400