Describe the problem of lack of coordination between design and construction in

ID: 1827909 • Letter: D

Question

Describe the problem of lack of coordination between design and construction in a traditional contract.In agency CM,what expertise does the CM provide during the pre-design and design phase?In agency CM,what expertise does the CM provide during the construction phase?Describe what the CM does in CMAR.Explain why having a single party to contact is an important aspect of design-build.List three potential benefits of using the design-build approach.List four things that should be included in the general information section of an RFP?Discuss the disadvantages of using the best value procurement.Discuss the formation of teams and consortiums.Explain why the need for good scheduling and planning of construction projects becomes more acute as construction projects become more complex.Describe the CPM backward pass.Describe at least four basic features of CPM software.Describe the CPM and project cost control.Describe the budgeted cost of work performed(BCWP).Discuss how complexity influences the cost of a construction project.

Explanation / Answer

Problem of lack of cordination btwn design and construction

The primary drawback is the lack of checks and balances associated with this delivery system. On a traditional design-bid-build system, the architect and contractor act as separate entities, each of which is responsible for protecting the best interests of the owner. When the design team and contractors are all working together, the owner may find himself working against both of these parties.

In many cases, design-build can leave the project owner feeling overwhelmed. As most organizations have limited construction experience, they may find it difficult to coordinate directly with the contractor as the project progresses. Instead of having the architect to represent the owner as in a design-bid-build contract, the owner must represent himself. A lack of experience with this process on the owner's part may lead to project delays or increased expenses in some situations.

Pre-design

During the pre-construction stage, a site investigation must take place. A site investigation takes place to discover if any steps need to be implemented on the job site. This is in order to get the site ready before the actual construction begins. This also includes any unforeseen conditions such as historical artifacts or environment problems. A soil test must be done to determine if the soil is in good condition to be built upon.

Design