I aylllenl Bönd, Performance Bond, and Guarantee Bond 30. The inspector usually communicates with sub-contractors through: A. the architect/engineer B. C. D. E. the owner the consultant. the contractor's superintendent. an ombudsman 31. A residen t project representative may permit the use of substitute materials if A. he or she considers them equivalent. B. they cost the same price. C. there is a savings on the job by the substitution. D. they have been approved by the architect/engineer E. if they are better than those originally specified. or reject faulty work? ?.the architect/engineer. B.the foreman. C. the inspector D. the superintendent. E. the owner

Explanation / Answer

B)

The inspector usually communicates with the sub-contractor via the Main contractor, also known as a Consultant.

D)

A resident project may use alternative materials only after they have deemed fit to use by the Consulting on-site Engineer and Architect.

C)

The inspector has the final authority