Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

A pond with a storage volume of 350 cu m is placed at the low end of a newly dev

ID: 518055 • Letter: A

Question

A pond with a storage volume of 350 cu m is placed at the low end of a newly developed area. A rain storm lasts 6 hours and all the flow goes through the pond. It drains at a fixed rate of 320 L/minute in order to protect the downstream area from flooding. What is the maximum flow rate of water can enter the pond over the entire six hours so that the pond does not overflow? b) What reasons are there for installing a pond like this? Answer for the reasons that apply in your opinion: otherwise leave blank. The pond is needed when an upstream area is paved ? Explain? Only needed when the owner wants a wetland built? Explain? The pond is needed when the runoff amount from a piece of property decreases the amount of water that goes to infiltration and gives us a faster time of concentration?

Explanation / Answer

link of the solution is provided.

Link - https://drive.google.com/open?id=0B9gVihFvAg8nb2E0SUxQbVhsYjQ

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote