21) The aggregate planning problem: A. Should only consider supply management op

ID: 471033 • Letter: 2

Question

21)

The aggregate planning problem:

A.

Should only consider supply management options

B.

Only affects marketing and production, but human resources is   not involved in decisions

C.

Should only consider demand management options

D.

Needs to consider multiple tradeoffs such as customer service   level, inventory levels, labor force

stability, and costs

22)

The carrying cost for inventory consists of which cost   components?

A.

Capital cost, obsolescence cost, and ordering cost

B.

Obsolescence cost, capital cost, and stockout cost

C.

Obsolescence cost, storage cost, and capital cost

D.

Storage cost, handling cost, and obsolescence cost

23)

In a production environment, examples of TOC Exploitation   Tactics include all except:

a)

Make sure all material is actually of good quality

b)

Assure constraint resource runs as much as possible

c)

Schedule the constraining resource the best way possible to   maximize throughput

d)

Create a buffer between the material release point and the   constraining resource

24)

Capacity, as opposed to inventory:

A.

Is the rate at which a stock can be depleted

B.

Covers anticipated changes in demand or supply

C.

Is resources that provide the potential to produce items

D.

Is a stock of raw materials, work in process, or finished goods   used to facilitate production or

satisfy customer demands

25)

Which of the following statements is true about facilities   decisions?

A.

They are generally short-range in nature.

B.

They are not critical as they only determine future availability   of output.

C.

They involve all organizational units and are often made at the   highest corporate level.

D.

They are simple and easy to analyze.

26)

The reason(s) for batch scheduling being a complex management   problem is/are:

A.

Irregular flow of units with many starts and stops

B.

Layout of the batch process by machine group or skills into work   centers

C.

Batches result in inventory or people waiting in queues

D.

All of the above


DSCI 434 Final Term Exam Fall 2013

5

27)

According Dr. K Youngman, all of the following are synchronous   manufacturing methods except:

a)

Mass production (Henry Fords

  

21)

  

Explanation / Answer

1) a


2) c


3) d

4) a


5) b

6) a

7) c


8) a

9) d