Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

5 Malll Avalanche, Inc. is a manufacturer of premiu combination of precision mac

ID: 395848 • Letter: 5

Question

5 Malll Avalanche, Inc. is a manufacturer of premiu combination of precision machining and skilled craftsmanship. Br is completion, skis are processed back and forth between six diffen partments: () molding, (2) cutting, (3) fiberglass weaving. (4) gn. m snow skis. The w 7-6. . (5) finishing, and (6) waxing. Avalanche is opening a new facility and wants to lay it out as efficiently as possible. The nu loads of material moved from department to department at e erations in other plants is shown below. Arrange the depa Avalanche's new plant in a 2 X 3 grid so that nonadjacent number of oads are minimized. Load Summary Chart From/To 1 100 75 100 60 85 70 60 10 45 30 100 50 25 70 65 30 40 65 35

Explanation / Answer

Then we do the following

Then the total for each combination:

Now decide the priority

So as per the above: we get

1 2 3 4 5 6 1 100 75 100 60 2 10 45 60 3 30 85 4 100 50 70 5 25 70 30 40 65 6 65 35
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote