Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

Problem 7: (10 Pointo) citcle the correct ansver is the tollowing tive multiple

ID: 385237 • Letter: P

Question

Problem 7: (10 Pointo) citcle the correct ansver is the tollowing tive multiple cheice questiona 2) zE, and , sre binary variables where the value 1 signities accept" the project, theequation requiring the selection of only it s,is fiest seleeted is: 2) A product, it it i·nanufactured .. aii.-at b, s.. produced. hich of the foilowing constraints or 11 be reqai red r2 ly, where y-0 or 1 20. 20 3) If , andare binary variable"her. tha value ; the seleetien ot , it , s selected and vice versa 4) E x, and , are binary variables where the value i signities "acceps the project, the equation reqairing that if@)ia 8.legte4. then E cannot b· selected. L s) se , and , are binary variables where the value1 aignafies "accept the project, the oquation requiring that at least one of the pair, , and , will be selected ia

Explanation / Answer

1) d. xi >= x4

2) b. x <= Ly, where y = 0 or 1i x>= 0 , y >= 0

3) a. xi = x4

4) b. xi + x4 = 1

5) c. xi + x4 >= 1

The picture is very hazy, so the subscripts (i,4 etc) of variable xi, x4 are not clearly visible. However, the logic is correct.

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote