Question

DESIGN PAGE LAYOUTREFERENCES MAILINGS REVIEWVIEW DESIGN LAYOUT 5. Based on the data of the figure and table presented above, complete the following tables: PLEASE ITEM C Lead Time On 20 10 1 week 50 100 LFL LFL 50 100 1* week 100 10 100 3"d week The master production Schedule calls for production of 60 As in week 9 and 50 in week 10 C Period Level Code Lead Time On hand Order Quantity Schedule Receipt Gross Requirements Schedule Receipts Projected Available l Net Requirements Planned Order Receipt Planned Order Release tems

Explanation / Answer

Materials resource planning takes into account:

This question needs to have gross requirement column to state the demand forecast which is missing. If it is given elsewhere you can use it to poulate the table accordingly.

Item-C Period 1 2 3 4 5 6 7 8 9 10 Level code- Gross requirement ? Lead Time-1 week Schedule receipts 100 On Hand-50 Projected available 150 Order quantity-100 Net requirements 100 Schedule receipt-100 Planned order receipt 100 Planned order release 100