0.525 DUE: Monday 10/23/2017 during lecture or 5pm to TA office 2600 EGR Fall 20
ID: 3598149 • Letter: 0
Question
0.525 DUE: Monday 10/23/2017 during lecture or 5pm to TA office 2600 EGR Fall 2017 Production Data for Lab #5 Professor Name: Professor Name: Name(s) Make ure youfullll deliverabele, with proper graphs(Cwell tiled), U'se aditional pages as needed. 1. The completed Excel spreadsheet. Use the parameters from the stations' Plant Simulation process time distributions to compute the percentiles, (p), (3 POINTS) 2. find Z value percentile and (p) for station i and 3.Remember to Give formulas used to find min, max, average, and standard deviation for the process time data. (2 POINTS). 3. Two probability plots (using X-Y scatter plot in Excel) (2 POINTS): Station i Uniform plot Theoretical (p) vs Simulation (Process Time) · Station 3 Normal plot Theoretical (p) vs Simulation (Process Time) . Add a trend line to your plot . Don't forget to adjust decimals and units .Adjust your X axis scale properly (by double click on your scale and use Axis Option to adjust what is needed, including "number" decimal choice) 20 25 30 35 445 50 55 60 70 x-Unknown or (sec) Since we used 2 hypothetical distributions in this lab (Uniform and Normal), why is it meaningful to do these probability plots (hint: text book page 230)? (1 point) 4. Since this is the last Lab engineer, tell us how you an example (1 point). 5. with plant simulation software "Tecnomatix", as a future can use a program like this to help complete your task? (give us ** (I point for quality of your report)Explanation / Answer
1. In plant simulation,the Siemens Plant Simulation software is used to derive the various activities.With the help of this software,we can optimise or calculate or evaluate the following things like to calulate the flow of the material,logistics and resource utilization for every level of plant planning.This software being used in it is type of discrete event simulation tool.It is an extensive analysis tool.It gives the result fastly,reliable and gives faster dacisions on the evaluation.
In plant simulation,we can make different model of production systems with the different type of processes involved in this system.All its features of having quality wise products are achieved from local plants to specific lines.
Parameters that it involves for its production facility or we can also term them as capabilities of this technique on which it focuses and derive the different different advantages of it as a new technique or benifit of this model .these are as follows:
1. It is a report builder based on HTML.
2. Perform automatic analyses of the result of simulation.
3. Give value stream mapping and simulation,manage the library and perform object management.
4. Optimize the genetic algorithm
5. It uses open architecture and object oriented models.
6. reuse and optimize resource consumption is one of its great benefit out of all benefits.