An assembly line at the Yokohama Plant in West Point has 22 tasks is to be balanced to produce a special variety of tires. The longest task is 5.6 minutes, and the total time for all tasks is 27 minutes. The line will operate for 480 minutes per day. What are the minimum and maximum cycle times? 27 minutes of maximum cycle time 5.6 minutes of minimum cycle time 18 minutes of minimum cycle time 2.4 minutes of maximum cycle time 5.6 minutes of maximum cycle time 27 minutes of minimum cycle time 2.4 minutes of minimum cycle time 18 minutes of maximum cycle time
Explanation / Answer
27 minutes of maximum cycle time 5.6 minutes of minimum cycle time
Explanation:
Minimum cycle time = length of longest task, which is 5.6 minutes.