Superway Inc. produces four models of computers. Each Model X computer requires
ID: 3205666 • Letter: S
Question
Superway Inc. produces four models of computers. Each Model X computer requires 3.2 labor-hours in the electronics division, 1.5 labor-hours in the manufacturing divisions and 2 labor-hours in the assembly division. Each Model Y computer requires 2.2 labor-hours in the electronics division, 1.2 labor-hours in the manufacturing division and 1 labor -hour in the assembly division . Each Model Z computer requires 2.2 labor-hours in the electronic division, 1.6 labor-hours in the manufacturing division and 1 labor-hour in the assembly division. Each Model Q computer requires 2.6 labor-hour in the electronics division, 2 labor-hours in the manufacturing division and 2 labor-hours in the assembly division. In additional 30 minutes of labor is required for testing each computer produced. Every week Superway has available 1000 labor-hours in the electronics division, 592 labor-hours in the manufacturing assembly division,520 labor-hours in the assebly division, and 212 labor-hours in the testing division. How many of each model should be produced per week so that all available labor-hours are used?
Definition of Variables:
System of Equations:
Answers in Words:
Explanation / Answer
Suppose X type computers produced are a in numbers
Suppose Y type computers produced are b in numbers
Suppose Z type computers produced are c in numbers
Suppose Q type computers produced are d in numbers
..........
Therefore
Total work hours in Electronics division = 3.2a + 2.2b + 2.2c + 2.6d
Total work hours in Manufacturing division = 1.5a + 1.2b + 1.6c + d
Total work hours in Assembly = 2a+b+c+2d
extra 30 minutes of labour for each type = 0.5 labour hours X total produced = (0.5)X( a+b+c+d)
---------------
Given 1000 labour hours in electronics division
therefore equation (1)
3.2a + 2.2b + 2.2c + 2.6d = 1000 --------------- (1)
Given 592 labour hours in manufacturing division
therefore eqn 2
1.5a + 1.2b + 1.6c + d = 592 ....................... (2)
Given 520 labour hours in assembly division
therefore eqn 3
2a+b+c+2d = 520 ........................(3)
Given 212 labour hours in assembly division
therefore eqn 4
0.5a +0.5b +0.5c +0.5d = 212------------------(4)
Solve all equations , since there are 4 variables , 4 equations
We get on solving =
So Type X would be
3.2a+1.5b+2c = Putting a ,b,c values = 743.6 or 743 computers since always less will be produced
So Type Y would be
2.2a+1.2b+1c = Putting a ,b,c values = 460 computers
So Type Z would be
2.2a+1.6b+1c = Putting a ,b,c values = 512.8 or 512 computers
So Type Q would be
2.6a+2b+2c = Putting a ,b,c values = 780.8 or 780 computers
Type of Model /Type of Labour Hours Electronics Manufacturing Assembly X 3.2 1.5 2 Y 2.2 1.2 1 Z 2.2 1.6 1 Q 2.6 2 2Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.