Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

PLEASE POST ALL STEPS. THANK YOU!! v2.cengagenow.com Movie Rentals at Redbox pay

ID: 2468674 • Letter: P

Question

PLEASE POST ALL STEPS. THANK YOU!!

v2.cengagenow.com Movie Rentals at Redbox payment @ p...webview.com my account T.J.Maxx Secret Netflix Codes https://www....1ESMCSW.pdf Suggested Sites WhitePages 31 Smart IKEA ideas for kids - YouT.... Baby Boy Bakery | My First Year, CengageBrain - Login or Regist CengageNOWv2 | Online teaching... The Following Data Relate To Facto... JESUS - Pelicula Completa (Espan...+ Oo Ch 22 HW 2 Calculator eBook Factory Overhead Cost Variances The following data relate to factory overhead cost for the production of 7,000 computers: Actual: Variable factory overhead Fixed factory overhead 7,000 hrs. at $58 $344,600 79,750 406,000 Standard: If productive capacity of 10096 was 11,000 hours and the factory overhead cost budgeted at the level of 7,000 standard hours was $435,000, determine the variable factory overhead Controllable Variance, fixed factory overhead volume variance, and total factory overhead cost variance. The fixed factory overhead rate was $7.25 per hour. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number Variance Controllable variance Volume variance Amount $-10,650 V $-21,750 X $-11,100 X Favorable/Unfavorable Favorable Unfavorable Unfavorable No Shared Links Total factory overhead cost variance: Click "Subscriptions" to select the social network, app, and website feeds you want to appear here Feedback Check My Work The variable factory overhead controllable variance is the difference between the actual variable overhead costs and the budgeted variable overhead for actual production The fixed factory overhead volume variance is the difference between the budgeted fixed overhead at 100% of normal capacity and the standard fixed overhead for the actual units produced. earning Objective 4 sending data to server Check My Work 3 more Check My Work uses remaining Assignment Score: 62.88% Saving... Save and Exit Submit Assignment for Grading Subscriptions

Explanation / Answer

Production 7000 Computers Actual Variable Factory Overhead $ 344,600.00 Fixed Factory Overhead $    79,750.00 Standard 7000Hrs @ 58 $ 406,000.00 At 100% Capacity 11000 Hours Budgeted Factory Overhead $ 435,000.00 Fixed Factory Overhead Rate $               7.25 Per Hour Standard Variable Overhead Rate $            50.75 Per Hour Budgeted Variable Overhead $ 355,250.00 Variable Overhead Controllabe Variance= Actual Variable Overhead-Budgeted Variable Overhead Variable Overhead Controllabe Variance= $ (10,650.00) (F) Fixed Factory Overhead Volume Variance = Production capacity not used*7.25 $    29,000.00 (U) Total factory Overhead cost variance= Actual Overhead-(Actual Output* Standard overhead rate) $    18,350.00 (U)

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote