Dehner Corporation uses a job-order costing system with a single plantwide prede
ID: 2392911 • Letter: D
Question
Dehner Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor- hours. The company based its predetermined overhead rate for the current year on the following data: Total direct labor-hours Total fixed manufacturing overhead cost Variable manufacturing overhead per direct labor-hour 44,000 $224,400 $ 5.00 Recently, Job P951 was completed with the following characteristics: Number of units in the job Total direct labor-hours Direct materials Direct labor cost 25 100 $ 750 $4,400 The unit product cost for Job P951 is closest to: (Round your intermediate calculations to 2 decimal places.)Explanation / Answer
Correct answer is option A $246.40
Calculation of unit product cost for JOB P951
Direct materials
$750
Direct labor
$4400
Variable manufacturing overhead(100*5)
$500
Fixed manufacturing overhead cost
($2,24,400 / 44000 Hours)*100
$510
Total product cost
6160
So Product cost per unit (6160/25 units)
246.4
Direct materials
$750
Direct labor
$4400
Variable manufacturing overhead(100*5)
$500
Fixed manufacturing overhead cost
($2,24,400 / 44000 Hours)*100
$510
Total product cost
6160
So Product cost per unit (6160/25 units)
246.4
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.