Activity-Besed Costing: Factory Overhead Costs he total factory overhead for Bardot Marine Company is budgeted for the year at Fabrication Assembly Setup Speedbost 7,750 dih21,750 dih 56 setups 97 inspections 31,000 dih 29,000 dih 465 setups 775 inspections Each product is budgeted for 7,500 units of production for the year a. Determine the activity rates for each activity. Fabrication per direct labor hour ssemblyper directlabor hour Setup Inspection b. Determine the activity-based factory overhead per unit for each product. Round to the nearest whole dollar Speedbost Dass bost per setup per inspection per unit per unit

Explanation / Answer

a .The correct answer is :

Note:

b. The correct answer is :

Notes:

Fabrication 15 per direct labor hour Assembly 6 per direct labor hour Setup 460 per setup Inspection 230 per inspection
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote