office building. It is expected that the vertical stress at the top of the clay
ID: 1844767 • Letter: O
Question
office building. It is expected that the vertical stress at
the top of the clay will increase by 150 kPa and at the
bottom by 90 kPa. Assuming a linear stress distribution
within the clay, calculate the consolidation settlement.
(Hint: You should divide the clay into five equal layers,
compute the settlement for each layer, and then find the
total settlement.) Groundwater level is at the top of the
clay layer. An oedometer test on a sample of the clay
revealed that 90% consolidation on a 20-mm-thick sample
occurred in 40 minutes. The sample was drained on
the upper and lower boundaries. How long will it take
for 50% consolidation to occur in the field?
Explanation / Answer
Not able to see the picture. Kindly post the link to the picture in comments so that i can help.
thank you.
Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.