The critical path a. is any path that goes from the starting node to the complet
ID: 461262 • Letter: T
Question
The critical path a. is any path that goes from the starting node to the completion node. b. is a combination of all paths. c. is the shortest path. d. is the longest path. Making a good decision a. requires probabilities for all states of nature. b. requires a clear understanding of decision alternatives, states of nature, and payoffs. c. implies that a desirable outcome will occur. d. All of the alternatives are true. Gradual shifting of a time series to relatively higher or lower values over a long period of time is called a. periodicity. b. cycles. c. seasonality. d. trend. Decision alternatives a. should be identified before decision criteria are established. b. are limited to quantitative solutions c. are evaluated as a part of the problem definition stage. d. are best generated by brain-storming. 20. Which of the methods for decision making best protects the decision maker from undesirable results? a. the optimistic approach b. the conservative approach c. minimum regret d. minimax regretExplanation / Answer
16) c. is the shortest path: Critical path is the path which takes minimum time
17) b. Other 2 options are incomplete.
18) d. Trend: definition
19) d. are best generated by brain storming
20) b. conservative approach
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.