In a job shop, effective capacity is only 49 percent of design capacity, and act
ID: 445053 • Letter: I
Question
In a job shop, effective capacity is only 49 percent of design capacity, and actual output is 64 percent of effective output. What design capacity would be needed to achieve an actual output of 11 jobs per week? What is its effective capacity?a. The Design Capacity needed to achieve the required actual job outputs = (round to whole number)
b. The Effective Capacity needed to achieve the required actual job outputs = (round to In a job shop, effective capacity is only 49 percent of design capacity, and actual output is 64 percent of effective output. What design capacity would be needed to achieve an actual output of 11 jobs per week? What is its effective capacity?
a. The Design Capacity needed to achieve the required actual job outputs = (round to whole number)
b. The Effective Capacity needed to achieve the required actual job outputs = (round to
Explanation / Answer
b) Efficiency = Actual output / Effective Capacity
=11 jobs per week / 0.64
=17 jobs per week
__________________________________________________
a) Design Capacity =
49 Percentage = 17 jobs for effective from Design
100 Percentage=? jobs needed for Design
By cross multiplication= 100 * 17 / 49
=35 jobs
_________________________________________________________________
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.