As the lead software engineer, you have been directed to minimize the cost of th

ID: 3890788 • Letter: A

Question

As the lead software engineer, you have been directed to minimize the cost of the system in development (cost polynomial) for the anticipated life of the project. State explicitly what Yourdon and Constantine reported minimized the first 3 terms of the cost polynomial and why these principals reduced the cost each term. Finally state why your approach simultaneously minimize the cost of the overall system. Please also discuss Miller, Graicunas, coupling, cohesion, scope, fan in/out, factoring and other metrics developed by Yourdon and Constantine.

Explanation / Answer

Answer:

So to minimize the cost of a project or a system there are some of the things which can be done. These are as follows: