AppData/Local/Packages/Microsoft.MicrosoftEdge 8wekyb3dabbwe/TempState/Downloads/p There are two products being produced by a firm with the following bills of material: 3. P (2) 2 (3) s( 2) Routing Information (all times in hours) Size Work Operation Setup Run Time Seto hours Per Unit/per 20 100 40 100 200 70 300 50 200 300 200 300 0.6 0.8 1 of 1 1 of 1 1 of 1 1 of 1 1 of 2 2 of 2 1 of 2 2 of 2 0.8 1.2 0.4 0.7 0.5 1.3 0.6 012 1.212 0.9 005 905 02 1.22 004 404 029 729 .032 .532 016 816 100 50 100 100 1.6 0.8 1.2 0.5 With this information, set up the capacity bills and determine the capacity needed per work center to run the following master schedule: Week Product C Product D 50 40 45 Week 1 Week 2Week 3 Work Center C DCD 30 Fill in the Work Center Load in the table above.Explanation / Answer
The MRP Schedule: (Assume the items will be produced in same week in which they are ordered)
Item: C
OH = 0
LT = 0
SS = 0
Q = 20
1
2
3
Gross Req.
50
40
45
Scheduled receipts
0
0
0
Projected-on-hand
10
10
5
Net Requirement
50
30
35
Planned order Receipts
60
40
40
Planned order releases
60
40
40
Time/unit on WC #100
0.83
0.83
0.83
Load on WC #100
49.8
33.2
33.2
Time/unit on WC #200
0
0
0
Load on WC #200
0
0
0
Time/unit on WC #300
0
0
0
Load on WC #300
0
0
0
Item: P (1 per item C)
OH = 0
LT = 0
SS = 0
Q = 100
1
2
3
Gross Req.
60
40
40
Scheduled receipts
0
0
0
Projected-on-hand
40
0
60
Net Requirement
60
0
40
Planned order Receipts
100
0
100
Planned order releases
100
0
100
Time/unit on WC #100
0
0
0
Load on WC #100
0
0
0
Time/unit on WC #200
0.404
0.404
0.404
Load on WC #200
40.4
0
40.4
Time/unit on WC #300
0
0
0
Load on WC #300
0
0
0
Item: Q (3 per item C)
OH = 0
LT = 0
SS = 0
Q = 70
1
2
3
Gross Req.
180
120
120
Scheduled receipts
0
0
0
Projected-on-hand
30
50
0
Net Requirement
180
90
70
Planned order Receipts
210
140
70
Planned order releases
210
140
70
Time/unit on WC #100
0
0
0
Load on WC #100
0
0
0
Time/unit on WC #200
0
0
0
Load on WC #200
0
0
0
Time/unit on WC #300
0.729
0.729
0.729
Load on WC #300
153.09
102.06
51.03
Total Load on WC #100
49.8
33.2
33.2
Total Load on WC #200
40.4
0
40.4
Total Load on WC #200
153.09
102.06
51.03
Item: D
OH = 0
LT = 0
SS = 0
Q = 40
1
2
3
Gross Req.
15
20
18
Scheduled receipts
0
0
0
Projected-on-hand
25
5
27
Net Requirement
15
0
13
Planned order Receipts
40
0
40
Planned order releases
40
0
40
Time/unit on WC #100
1.22
1.22
1.22
Load on WC #100
48.8
0
48.8
Time/unit on WC #200
0
0
0
Load on WC #200
0
0
0
Time/unit on WC #300
0
0
0
Load on WC #300
0
0
0
Item: P (2 per item D)
OH = 0
LT = 0
SS = 0
Q = 100
1
2
3
Gross Req.
80
0
80
Scheduled receipts
0
0
0
Projected-on-hand
20
20
40
Net Requirement
80
0
60
Planned order Receipts
100
0
100
Planned order releases
100
0
100
Time/unit on WC #100
0
0
0
Load on WC #100
0
0
0
Time/unit on WC #200
0.404
0.404
0.404
Load on WC #200
40.4
0
40.4
Time/unit on WC #300
0
0
0
Load on WC #300
0
0
0
Item: R (1 per item D)
OH = 0
LT = 0
SS = 0
Q = 50
1
2
3
Gross Req.
40
0
40
Scheduled receipts
0
0
0
Projected-on-hand
10
10
20
Net Requirement
40
0
30
Planned order Receipts
50
0
50
Planned order releases
50
0
50
Time/unit on WC #100
0
0
0
Load on WC #100
0
0
0
Time/unit on WC #200
0.532
0.532
0.532
Load on WC #200
26.6
0
26.6
Time/unit on WC #300
0.816
0.816
0.816
Load on WC #300
40.8
0
40.8
Item: S (2 per item R)
OH = 0
LT = 0
SS = 0
Q = 100
1
2
3
Gross Req.
100
0
100
Scheduled receipts
0
0
0
Projected-on-hand
0
0
0
Net Requirement
100
0
100
Planned order Receipts
100
0
100
Planned order releases
100
0
100
Time/unit on WC #100
0
0
0
Load on WC #100
0
0
0
Time/unit on WC #200
1.212
1.212
1.212
Load on WC #200
121.2
0
121.2
Time/unit on WC #300
0.905
0.905
0.905
Load on WC #300
90.5
0
90.5
Load on WC #100
48.8
0
48.8
Load on WC #200
188.2
0
188.2