Based on a careful work study in the Hofstetter Corp., the results shown in the

ID: 376583 • Letter: B

Question

Based on a careful work study in the Hofstetter Corp., the results shown in the following table have been observed Observation (minutes per cycle) Performance Rating 125% 110% 85% 85% 2 41 4 43 14 Element 39 Prepare daily reports Photocopy results Label and package reports Distribute reports 34 13 34 37* 4 16 18 16 45A Photocopying machine broken; included as delay in the allowance factor APower outage; included as delay in the allowance factor The allowance factor for this type of work is given to be 15%. (Round all intermediate calculations to two decimal places before proceeding with further calculations.) a) The normal time for the "prepare daily reports" operations | | minutes (round your response to two decimal places)

Explanation / Answer

PLEASE FIND ANSWER TO ALL BUT LAST QUESTION :

Below table presents calculated values of average time for each element:

   O B S E R V A T I O N S

Element

1

2

3

4

5

Average time = Sum of observations/5

Prepare daily report

34

41

34

43

39

38.2

Photocopy results

13

9

37

14

14

17.4

Label and package report

3

4

4

5

5

4.2

Distribution reports

16

18

22

16

45

23.4

Normal time = Average time x Performance rating factor

Thus ,

Normal time for all elements as follows :

ELEMENT

AVERAGE TIME (MINUTES PER CYCLE )

PERFORMANCE RATING FACTOR = PERFORMANCE RATING ( %)/100

NORMAL TIME( MINUTES ) = AVERAGE TIME X PERFORMANCE RATING FACTOR

Prepare daily reports

38.2

1.25

47.75

Photocopy results

17.4

1.1

19.14

Label and package reports

4.2

0.85

3.57

Distribute reports

23.4

0.85

19.89

Thus, Normal time for overall process = 47.75 + 19.14 + 3.57 + 19.89 minutes = 90.35 minutes

NORMAL TIME FOR OVERALL PROCESS = 90.35 MINUTES

Allowance factor = 15% ( or, 0.15)

Hence,

Standard time for this process = Normal time / ( 1 – Allowance factor) = 90.35 / ( 1 – 0.15) = 90.35/0.85 = 106.29 minutes

STANDARD TIME FOR THIS PROCESS IS 106.29 MINUTES

   O B S E R V A T I O N S

Element

1

2

3

4

5

Average time = Sum of observations/5

Prepare daily report

34

41

34

43

39

38.2

Photocopy results

13

9

37

14

14

17.4

Label and package report

3

4

4

5

5

4.2

Distribution reports

16

18

22

16

45

23.4

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote