As the production planner for Xiangling Hu Products, Inc., you have been given a

ID: 368460 • Letter: A

Question

As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 1 spring, and 3 clamps. The base is assembled from 2 clamps and 2 housings. Each clamp has 1 handle and 2 castings. Each housing has 1 bearing and 2 shafts. There is no inventory on hand a) Design a product structure noting the quantities for each item and show the low-level coding. Match each number in the structure below with the corresponding item. Bracket Item Spring(1) Housing(2) Casting(2) Number Base IV | Shaft Clamp(3) Clamp(2) Handle, 1) | | Casting 2 Handle() III Bearing) Enter your answer in the edit fields and then click Check Answer.

Explanation / Answer

b)

Base : 150 units

Spring : 150 units

Clamp : 150*3 {for Bracket} + 150*2{ for Base} = 750 units

Housing : 150*2 = 300 units

Handle : 750*1 = 750 units

Casting : 750*2 = 1500 units

Bearing : 300*1 = 300 units

Shaft : 300*2 = 600 units

c)

Base : 150-25 = 125 units

Spring : 150 units

Clamp : 150*3+125*2 -100 = 600 units

Housing : 125*2 = 250 units

Handle: 600*1 = 600 units

Casting: 600*2 = 1200 units

Bearing : 250*1 = 250 units

Shaft : 250*2 = 500 units