Question True/False 1 CASE stands for Computer Aided Service Engineering. 2 Mana
ID: 3676229 • Letter: Q
Question
Question
True/False
1 CASE stands for Computer Aided Service Engineering.
2 Management of requirements and system scope is one of the hardest parts of managing a project.
3 In RAD or agile development methodology (especially with BPR), a significant amount of time and effort is spent in understanding the as-is system.
4 The primary goal of a system is to create value for the organization.
5 Using industry standards, the general estimated project time for the implementation phase is 15%.
6 In use case, an actor must be a person that interacts with the system.
7 Use case model is an external or functional-view of the business process.
8 Being a systems analyst is one of the most interesting, exciting and challenging jobs available.
9 Use case is only used to describe the current existing system, NOT the proposed system.
10 JAD stands for Joint Application Design.
11 Use case diagram represent actors in the use case as human matchstick figure even if the actor is non-human.
12 Once the list of interviews is determined, it rarely grows.
13 The most commonly used requirements gathering technique is the interview.
14 The project methodology that takes the longest to complete is Throwaway Prototyping Methodology.
15 A temporal trigger means an action that is taken as a result of the actor clicking an input button.
Explanation / Answer
1.CASE stands for Computer Aided Service Engineering.
Answer-true
2 Management of requirements and system scope is one of the hardest parts of managing a project.
Answer-true
3- In RAD or agile development methodology (especially with BPR), a significant amount of time and effort is spent in understanding the as-is system.
Answer-true
4 The primary goal of a system is to create value for the organization.
Answer-true
5 Using industry standards, the general estimated project time for the implementation phase is 15%.
Answer-false
6 In use case, an actor must be a person that interacts with the system
Answer-true
8)Being a systems analyst is one of the most interesting, exciting and challenging jobs available.
Answer-true
10) JAD stands for Joint Application Design
Answer-true
12 Once the list of interviews is determined, it rarely grows.
Answer-true
13 The most commonly used requirements gathering technique is the interview.
Answer-true
14 The project methodology that takes the longest to complete is Throwaway Prototyping Methodology.
Answer-false
15 A temporal trigger means an action that is taken as a result of the actor clicking an input button.
Answer-true