You have been asked to consult on setting up a LEAN production line for Baxter Industries, which produces injected plastic moldings for inkjet printers. Which of the following is NOT an element of Lean (Just-in-Time) manufacturing? O Having only the minimum quantities of required raw materials on site for the daily production run Rewarding workers for reducing production line set-up times. All of these are elements of Lean Using demand sensitive Push systems as much as possible. Focusing on improving how workers view quality so that only "zero defects" is acceptableExplanation / Answer
The answer should be
C. All of these are elements of Lean
Because all these expectations from the Lean system within the organization.
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.