construction management For a public works project, changes may not be made whic
ID: 345989 • Letter: C
Question
construction management
For a public works project, changes may not be made which of the following phases? 18. to any of the documents during A. After bid opening, but before award of the contract B. Be fore opening of bids, but after advertising for bids. After bid opening, but before signing of the C. agreement. Atter award of the contract, but before signing the agreement. 19. If you are working for the owner/engineer and you are called upon in the field important decision in the field, you should to make an . tell the contractor that you cannot make a decision yourself; then, matter to your supervisor for a decision. B. on other portions of the work, then return to the contractor wi C. demonstrate to the contractor wha y he matter long enough to investigate all of the facts and their impact t an experienced and competent field engineer or inspector that you are by making a quick, firm decision. D. tell the contractor that you will give the matter some thought, then try to get back with a decision whenever you get the chance. If you are employed by the owner or engineer and you observe a safety hazard that could of the following: 20. in serious injury or death of a worker, (an imminent hazard) you should do which A. Document the information in your diary, but take no other action, as safety is the sole responsibility of the contractor. B. Immediately start searching for the contractor's superintendent or other supervisory person on the contractor's staff and issue instructions for him or her to order the employees out of the danger area, followed by corrective action by the contractor. C. Order the workers that are in potential danger to remove themselves from the hazardous area, then take administrative action to have the contractor correct the situation. D. Ignore the issue so as not to become involved. 21. In what section of a set of CSI format specifications would you find the following? Painting Plumbing Air Conditioning -Roofing Sewer Line Construction 22. List 12 unenforceable phrases that should not be used in a set of specifications.Explanation / Answer
18.
The correct option is “D”.
Reason: Because when a project is handed over to a party, the eligibility and ability are determined early so to ensure that the party can handle the project and shall deliver the work within time.
After the award of the contract, it cannot be changed.
19.
The correct option is “B”.
Reason: To reach to a final decision it requires checking and identifying several facts whose negative impact may not fall on others work, after certain valid thoughts, a final decision can be taken to the contractor with the positive attitude.
20.
The correct option is “B”.
Reason: The matter should be immediately taken to contractor’s superintendent and a corrective action plan is require generating for the safety of the workers.
21.
The section of a set CSI format:
Each division has been mentioned in their mostly chosen specification standards in the followings.
Painting: General Requirement
“Painting” is the general CSI format under this division.
Plumbing: Site Construction
“Plumbing” is the Site Construction CSI format under this division.
Air conditioning: Electrical
“Air conditioning” is the Electrical CSI format under this division.
Roofing: Concrete
“Roofing” is the Concrete CSI format under this division.
Sewer Line Construction: Special Construction
“Sewer Line Construction” is the Special Construction CSI format under this division.
22.
12 unenforceable phrases:
1. Improper explanation of the project requirements
2. Constructional requirements are not in sequential
3. Any pleasing or satisfying lines
4. Conflicts from outdated specifications
5. New drawings lead to conflict and somehow work disputes
6. Improper bidding process
7. An issue in construction contracts
8. Non- motioning of industry standards of work format and specifications
9. Un-defining of the construction documents
10. Using recognized manufacturer products
11. Using correct terms and not any slang words
12. Avoiding phrases like OR/AND and him/her in writing sentences