We are establishing a quality control program for a process and need to establis
ID: 3317844 • Letter: W
Question
We are establishing a quality control program for a process and need to establish the mean and standard deviation for the process. The first 10 batches had samples of size 5 taken, and the following data were recorded.
Batch
x s
1. 43.6, 2.55
2. 45.3, 1.85
3. 42.6, 1.93
4. 46.2, 2.67
5. 44.1, 3.13
6. 42.9, 2.59
7. 45.0, 2.01
8. 47.4, 2.35
9. 46.2 , 1.87
10. 43.1, 2.95
Which of the following are the upper and lower control limits for an x control chart?
a.(37.012, 52.268)
b.(37.470, 51.810)
c.(42.228, 47.052)
Explanation / Answer
Answer is below:
Take out average of Xbar (bar-bar) and s ( stdev bar) to get: 44.64 and 2.39 respectively.
Now, LCL and UCL will be given as Xbar-bar -3 *s-bar to Xbar-bar +3 *s-bar
Therefore, 44.64 -3*2.39 to 44.64 +3*2.39
=37.47 to 51.81
Answer is b. (37.470, 51.810)