Some researchers have conjectured that stem-pitting disease in peach-tree seedli
ID: 3294264 • Letter: S
Question
Some researchers have conjectured that stem-pitting disease in peach-tree seedlings might be controlled with weed and soil treatment. An experiment is conducted to compare peach-tree seedling growth when the soil and weeds are treated with one of two herbicides. In a field containing 20 seedlings, 10 are randomly selected throughout the field and assigned to receive herbicide A. The remainder of the seedlings is assigned to receive herbicide B. Soil and weeds for each seedling are treated with the appropriate herbicide, and at the end of the study period, the height in centimeters is recorded for each seedling. The following results are obtained: Herbicide A = 94.5 cm s1 = 10 cm Herbicide B = 109.1 cm s2 = 9 cm 1.
What is a 90% confidence interval for u2 –u 1? a. 14.6 ± 7.00 b. 14.6 ± 7.38 c. 14.6 ± 7.80 d. 14.6 ± 9.62
What can we say about the value of the P-value? a. P-value < 0.01 b. 0.01 < P-value < 0.05 c. 0.05 < P-value < 0.10 d. P-value > 0.10
Please answer both questions with some explanation,
Explanation / Answer
(a)
n1 = 10
n2 = 10
x1-bar = 109.1
x2-bar = 94.5
s1 = 9
s2 = 10
% = 90
Degrees of freedom = n1 + n2 - 2 = 10 + 10 -2 = 18
Pooled s = (((n1 - 1) * s1^2 + (n2 - 1) * s2^2)/DOF) = (((10 - 1) * 9^2 + ( 10 - 1) * 10^2)/(10 + 10 -2)) = 9.513148795
SE = Pooled s * ((1/n1) + (1/n2)) = 9.51314879522022 * ((1/10) + (1/10)) = 4.254409477
t- score = 1.734063592
Width of the confidence interval = t * SE = 1.73406359230939 * 4.25440947723653 = 7.377416581
The 90% confidence interval is 14.6 ± 7.38 (Option b)
(b)
Data:
n1 = 10
n2 = 10
x1-bar = 109.1
x2-bar = 94.5
s1 = 9
s2 = 10
Hypotheses:
Ho: 1 = 2
Ha: 1 2
Decision Rule:
= 0.1
Degrees of freedom = 10 + 10 - 2 = 18
Lower Critical t- score = -1.734063592
Upper Critical t- score = 1.734063592
Reject Ho if |t| > 1.734063592
Test Statistic:
Pooled SD, s = [{(n1 - 1) s1^2 + (n2 - 1) s2^2} / (n1 + n2 - 2)] = (((10 - 1) * 9^2 + (10 - 1) * 10^2)/(10 + 10 -2)) = 9.513
SE = s * {(1 /n1) + (1 /n2)} = 9.51314879522022 * ((1/10) + (1/10)) = 4.254409477
t = (x1-bar -x2-bar)/SE = 3.431733611
p- value = 0.002974816 (Option a)
Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.