A very expensive metal product that requires four sequential steps to go from ra
ID: 3272665 • Letter: A
Question
A very expensive metal product that requires four sequential steps to go from raw material to finished product also is very difficult to produce to specification. Manufacture of this discrete product requires four sequential operations with each having a 5% scrap rate. Remember this is discrete manufacturing, thus if anything is wrong with a part from operation 1, it is culled and only the good parts move on to operation 2. The same process of inspection, removal of bad parts and then input to the next sequential operation happens for each of the operations. How many parts should Operation 1 start with in order to ship 6000 good parts?Explanation / Answer
as OEE of process =(1-scrap rate)4 =(1-0.05)4 =0.8145
therefore required number of parts in the starting =6000/0.8145=~7367
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.