Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

1) You are structuring a Performance Based Logistics (PBL) Product Support Arran

ID: 3149104 • Letter: 1

Question

1) You are structuring a Performance Based Logistics (PBL) Product Support Arrangement (PSA) for a legacy system. A key military depot will assume the top level integration function to ensure that performance and product support outcomes are met. The PSA with the depot will likely be structured as which of the following?

a.) Cost Plus Award Fee (CPAF) Contract

b.) Fixed Price Incentive Fee (FPIF) Contract

c.) Fixed Price Award Fee (FPAF) Contract

d.) Memorandum of Understanding (MOU) or Memorandum of Agreement (MOA)

Explanation / Answer

Ans d

Because you are structuring PBL and top level military integration function t o ensure function of product.

So it is first stage of contract so we go through MOU or MOA

After that if they satisfied then we go through any of above 3 options.