1. Workforce Scheduling The transportation manager at a cross-dock for Walmart h

ID: 3144343 • Letter: 1

Question

1. Workforce Scheduling The transportation manager at a cross-dock for Walmart has a staffing problem. Demand for delivery of perishable goods varies throughout the day, but 24-hour coverage is necessary because the cross-dock handles a number of Walmart locations in a large metropolitan area. A recent study has shown how many delivery drivers are needed each hour in the course of the day, as shown below (hour 1 is from midnight to 1 am):

Hour

1

2

3

4

5

6

7

8

9

10

11

12

Drivers

4

3

2

2

3

5

6

6

9

10

10

10

Hour

13

14

15

16

17

18

19

20

21

22

23

24

Drivers

12

12

8

6

7

7

7

6

5

4

4

4

Under current labor policies, delivery drivers may be assigned to any one of six shifts, some of which overlap. The shifts and salary costs are as follows:

Shift

Daily Cost ($)

2 am – 10 am

160

6 am – 2 pm

145

10 am – 6 pm

148

2 pm – 10 pm

154

6 pm – 2 am

156

10 pm – 6 am

160

(a)Provide the transportation manager with a schedule that will deploy enough delivery drivers to meet hourly requirements at the minimum daily total cost.

(b)In the optimal schedule, how many hours are over-staffed?

Hour

1

2

3

4

5

6

7

8

9

10

11

12

Drivers

4

3

2

2

3

5

6

6

9

10

10

10

Hour

13

14

15

16

17

18

19

20

21

22

23

24

Drivers

12

12

8

6

7

7

7

6

5

4

4

4

Explanation / Answer

Solution

Starting with Hour 1, there are only two options available which have Hour 1. These options are:

Option 1: 6 pm – 2 am and Option 2: 10 pm – 6 am.

Proceeding with Option 1, the schedule would be:

7 drivers in the time slot 6 pm – 2 am at a cost of $156; 2 drivers in the time slot 2 am – 10 am at a cost of $160; 12 drivers in the time slot 10 am – 6 pm at a cost of $148.

Total cost = (7 x 156) + (10 x 160) + (12 x 148) = $4468

Proceeding with Option 2, the schedule would be:

5 drivers in the time slot 10 pm – 6 am at a cost of $160; 12 drivers in the time slot 6 am – 2 pm at a cost of $145; 8 drivers in the time slot 2 pm – 10 pm at a cost of $154.

Total cost = (5 x 160) + (12 x 145) + (8 x 154) = $3772.

Since 3772 < 4468, Option 2 is the optimum schedule, i.e.,

Time slot

10 pm – 6 am

6 am – 2 pm

2 pm – 10 pm

# drivers

5

12

8

  Total cost = $3772.

Over staffed hours

Over staff #

Number of hours

1

7

2

7

3

4

6

2

7

1

8

1

9

1

Time slot

10 pm – 6 am

6 am – 2 pm

2 pm – 10 pm

# drivers

5

12

8