AlwaysRain Irrigation, Inc., would like to determine capacity requirements for t

ID: 2772065 • Letter: A

Question

AlwaysRain Irrigation, Inc., would like to determine capacity requirements for the next four years. Currently two production lines are in place for making bronze and plastic sprinklers. Three types of sprinklers are available in both bronze and plastic: 90-degree nozzle sprinklers, 180-degree nozzle sprinklers, and 360-degree nozzle sprinklers. Management has forecast demand for the next four years as follows:

YEARLY DEMAND

Both production lines can produce all the different types of nozzles. The bronze machines needed for the bronze sprinklers require three operators and can produce up to 16,000 sprinklers. The plastic injection molding machine needed for the plastic sprinklers requires four operators and can produce up to 270,000 sprinklers. Three bronze machines and only one injection molding machine are available.

What are the capacity requirements for the next four years? (Assume that there is no learning.) (Enter the demand values in thousands. Round your answers to 2 decimal places.)

Please help thanks!

AlwaysRain Irrigation, Inc., would like to determine capacity requirements for the next four years. Currently two production lines are in place for making bronze and plastic sprinklers. Three types of sprinklers are available in both bronze and plastic: 90-degree nozzle sprinklers, 180-degree nozzle sprinklers, and 360-degree nozzle sprinklers. Management has forecast demand for the next four years as follows:

Explanation / Answer

Based on the information given

No of Machines = 3

Capacity = 16000

Total Capacity = 16000 * 3 = 48000 sprinklers

Labour = 3 operators per machine

Assumed that Labour can be hired only when a machine is to be operated

Injection Moulding Machine

Capacity = 270,000 sprinklers

Labour =4 Operators

Demand for Plastic sprinklers

Demand

Year 1 in‘000

Year 2 in‘000

Year 3

in‘000

Year 4 in‘000

Plastic 90

32

42

57

54

Plastic 180

13

15

18

14

Plastic 360

51

57

67

65

Total Plastic Demand

96

114

142

133

% Capacity Utilization

35.56

42.22

52.59

49.26

Machine Requirements

1 Machine

1 Machine

1 Machine

1 Machine

Labour Requirements

4 Operators

4 Operators

4 Operators

4 Operators

Bronze 90

6

9

8

15

Bronze 180

4

4

6

11

Bronze 360

11

12

17

19

Total Bronze Demand

21

25

31

45

% Capacity Utilization

43.75

52.08

64.58

93.75

Machine Requirements

2 Machines

2 Machines

2 Machines

3 Machines

Labour Requirement (3 * No of machines)

6 Operators

6 Operators

6 Operators

9 Operators

Demand

Year 1 in‘000

Year 2 in‘000

Year 3

in‘000

Year 4 in‘000

Plastic 90

32

42

57

54

Plastic 180

13

15

18

14

Plastic 360

51

57

67

65

Total Plastic Demand

96

114

142

133

% Capacity Utilization

35.56

42.22

52.59

49.26

Machine Requirements

1 Machine

1 Machine

1 Machine

1 Machine

Labour Requirements

4 Operators

4 Operators

4 Operators

4 Operators

Bronze 90

6

9

8

15

Bronze 180

4

4

6

11

Bronze 360

11

12

17

19

Total Bronze Demand

21

25

31

45

% Capacity Utilization

43.75

52.08

64.58

93.75

Machine Requirements

2 Machines

2 Machines

2 Machines

3 Machines

Labour Requirement (3 * No of machines)

6 Operators

6 Operators

6 Operators

9 Operators