It is a two page long. THANK you!! 19., Identify the appropriate cost-of-quality

ID: 2535356 • Letter: I

Question

It is a two page long. THANK you!!

19., Identify the appropriate cost-of-quality (COQ) category for each of the following items using the following letters: P - Preventive Costs A Appraisal Costs I - Internal Failure Costs E External Failure Costs Engineering time spent to simplify production processes Depreciation of test equipment. Analysis of the cause of defects in production. Lost sales arising from a reputation for poor quality. Engineering time spent on engineering change orders to reduce the number of components used in a current product. Plant utilities in the inspection area. Downtime due to quality problems. Warranty costs. Train employees on the importance of zero defects.

Explanation / Answer

1.   P Engeeneering time spent to simplify production processes.

2. A Depreciation of test equipment.

3. I Analysis of the cause of defects in the production.

4. E Lost sales arising from a reputation of poor quality.

5. P Engineering time spent on engineering orders to reduce the numbers.....

6. A Plant utilities in the inspection area.

7. I Downtime due to quality problems.

8. E Warranty Costs

9. P Training employees on the importance of zero defects.

10. A Measurement and analysis of data to ascertain conformity......

11. I Inspection cost for reworked units.

12. E Product liability arising resulting from legal action.

13. P Quality circles.

14. A Material inspection cost.

15. I Scrap rsulting from

16. E Sales returns and allowances due to quality deficiency.

17. P Technical support provided to suppliers.

18. A Test equipment maintenance

19. I Poor quality found through quality appraisal prior to delivery

20. E Contribution margin of cancelled sales orders due to quality deficiency.

21. P Costs to keep quality defects from occuring.

22. A Product inspections.

23. I Rework incurred before shipment of product.

24. E Air freight to replace a defective part discovered by a customer.

25. P Audits of the effectiveness of the quality system

26. A Scrap costs because of quality failure.

27. I Cost to acquire and install training equipment.

28. E Long distance call to a customer who experienced a quality failure.

29. P Consulting firm for cost of quality reporting.

30. A Establish a 24-hour hotine for customers to report quality failures

31. I Hire additional field service people to provide better services.

32. E Preventive maintenance on machinery.