Standard Lbs Standard Material Quantity (lbs) Cost/Lb Total Cost O 0 $0.10 $0 H

ID: 2502818 • Letter: S

Question

     Standard

    Lbs Standard

Material

   Quantity (lbs)

            Cost/Lb

        Total Cost

O

0

$0.10

$0

H

80

$0.08

$6.40

M

120

$0.02

$2.40

200

$8.80

A company makes a product using two materials, one of which is interchangeable with a third material. The standards for producing one 200-pound batch are presented below. The last 200-pound batch was produced using 140 pounds of M and 90 pounds of O. The price of M was $.03 per pound and the actual price of O was $.10. Is the materials mix variance favorable or unfavorable?


     Standard

    Lbs Standard

Material

   Quantity (lbs)

            Cost/Lb

        Total Cost

O

0

$0.10

$0

H

80

$0.08

$6.40

M

120

$0.02

$2.40

200

$8.80

Explanation / Answer

unfavorable because the cost is increased.

0.1*90 +140*(0.03)=4.2+9=13.2