A flexible budget is: a] prepared based on different levels of activity b] prepa
ID: 2417742 • Letter: A
Question
A flexible budget is:a] prepared based on different levels of activity b] prepared based on one level of activity c] prepared on a monthly basis only d] also known as activity-based budget e] less accurate than a static budget A flexible budget is:
a] prepared based on different levels of activity b] prepared based on one level of activity c] prepared on a monthly basis only d] also known as activity-based budget e] less accurate than a static budget
a] prepared based on different levels of activity b] prepared based on one level of activity c] prepared on a monthly basis only d] also known as activity-based budget e] less accurate than a static budget
Explanation / Answer
A flexible budget is prepared based on different levels of activity or The budget designed to change with the change in the activity levels is Flexible Budget.
Ans is a) prepared based on different levels of activity
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.