Which of the following is an example of value-added time? Question 1 options: Pr
ID: 2390412 • Letter: W
Question
Which of the following is an example of value-added time?Question 1 options:
Processing time
Wait time during inspection
Wait time in inventory
Both B and C
The just-in-time (JIT) philosophy attempts to reduce setup times, which will:
Question 3 options:
increase batch sizes
not affect batch sizes
increase within-batch wait time
decrease within-batch wait time
What do just-in-time (JIT) manufacturers demand from their vendors?
Question 4 options:
High quality materials
Low cost materials
On-time deliveries
All of the above
Objectives of just-in-time (JIT) manufacturing include:
Question 6 options:
eliminating waste
increasing inventory levels
increased number of inspections
all of the above
Inventory reduction is a ____ principle.
Question 7 options:
just-in-time
traditional processing
economic
wait time
Explanation / Answer
1)Both B and C
2) increase within-batch wait time
3)On-time deliveries
4)all of the above
5)economic
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.