An operation costing system is A. Identical to a job-order costing system, excep
ID: 2385776 • Letter: A
Question
An operation costing system isA. Identical to a job-order costing system, except that actual manufacturing overhead costs are traced to units of product.
B. Identical to a process-costing system, except that actual manufacturing overhead costs are traced to units of product.
C. The same as a process-costing system, except that direct material costs are accounted for in the same way as in job-order costing.
D. The same as job-order system, except that direct materials cost are accounted for in the same way as in process costing.
I'm torn between A and D. I don't really want to say A because it's not identical, however the second part of that answer is right. Help please!
Explanation / Answer
D. The same as job-order system, except that direct materials cost are accounted for in the same way as in process costing.
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.