The standard factory overhead rate is $7.50 per machine hour ($6.20 for variable

ID: 2370763 • Letter: T

Question

The standard factory overhead rate is $7.50 per machine hour ($6.20 for variable factory overhad and $1.30 for fixed overhead) based on 100% capacity of 80,000 machine hours. The standard cost and the actual cost of factory overhead for the production of 15,000 units during August were as follows:


Actual Variable Factory Overhead: $360,000

fixed factory overhead 104,000


Standard hours allowed for units produced: 60,000 hours


What is the maount of the factory overhead volume variance & what is the amount of the factory overhead controllable variance?

options for both are:

a) 12,000U

b) 12,000F

c) 14000U

d) 26000U


Please provide explanation with answer


Explanation / Answer

Option C

As we know

Factory Overhead controllable variance = (Actual variable and fixed factory overhead) - (Standard factory overhead rate standard hours allows for Actual production  

=(360000+104000)-(60000 hoursx7.50 per machine hour)

= 464000-450000

=14000 U