How much does a 178-m long concrete slab on the Mackinac Bridge contract when go
ID: 2260621 • Letter: H
Question
How much does a 178-m long concrete slab on the Mackinac Bridge contract when going from 39 How much does a 178-m long concrete slab on the Mackinac Bridge contract when going from 39 How much does a 178-m long concrete slab on the Mackinac Bridge contract when going from 39 How much does a 178-m long concrete slab on the Mackinac Bridge contract when going from 39 How much does a 178-m long concrete slab on the Mackinac Bridge contract when going from 39Explanation / Answer
L' = L* linear expansion coefficient*change in temperature => L' = 178*10^-5* (-35-39) => L' = -0.13172 m negative sign shows contraction