Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

How much does a 178-m long concrete slab on the Mackinac Bridge contract when go

ID: 2260621 • Letter: H

Question

How much does a 178-m long concrete slab on the Mackinac Bridge contract when going from 39 How much does a 178-m long concrete slab on the Mackinac Bridge contract when going from 39 How much does a 178-m long concrete slab on the Mackinac Bridge contract when going from 39 How much does a 178-m long concrete slab on the Mackinac Bridge contract when going from 39 How much does a 178-m long concrete slab on the Mackinac Bridge contract when going from 39

Explanation / Answer

L' = L* linear expansion coefficient*change in temperature => L' = 178*10^-5* (-35-39) => L' = -0.13172 m negative sign shows contraction

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote