Stage vs. Storage (Detention Basin 3 horizontal to I vertical (that is, Z-3), and a maximum depth (D) of 4.5 m, is used to reduce peak runoff from a small watershed. Tabulate the stage versus storage volume (V) relationship at 0.1-m increments. ntion pond with base of dimensions W-14.5 m and L 28.5 m, side slopes of Hint: According to HEC-22 (Third Edition. 2009), the volume of a trapezoidal basin can be calculated in a manner similar to that of rectangular basins by dividing the volume into triangular rectangular shaped components and applying the equation listed below. The variables in the equation are illustrated by the following figure: 1 D where: V- Volume at a specific depth, m (ft) D = Depth of ponding or basin, m (ft) L = Length of basin at base, m (ft) w = width of basin at base, m (ft) Z- Side slope factor; side slope is I to 2 (V:H). "Z" will be equal to 2 ratio of horizontal to vertical components of side slope; Example- if theExplanation / Answer
1) stage vs storage
given formula
V= LWD + (L+W)D2 + +4/3 Z2 D3
stage sted D'=0.1 m
Z=3 , L=28.5 m W=14.5 m
and D=4.5 m
at D= 0.1 m
first step
V= 28.5*14.5*0.1 +(28.5+14.5)*0.12 + 4/3*32*0.13 = 42.627 m3
remaining can be calculated in tabulated form as
thanks
stage depth (D) m storage volume (m^3) 0.1 42.627 0.2 87.906 0.3 135.909 0.4 186.708 0.5 240.375 0.6 296.982 0.7 356.601 0.8 419.304 0.9 485.163 1 554.25 1.1 626.637 1.2 702.396 1.3 781.599 1.4 864.318 1.5 950.625 1.6 1040.592 1.7 1134.291 1.8 1231.794 1.9 1333.173 2 1438.5 2.1 1547.847 2.2 1661.286 2.3 1778.889 2.4 1900.728 2.5 2026.875 2.6 2157.402 2.7 2292.381 2.8 2431.884 2.9 2575.983 3 2724.75 3.1 2878.257 3.2 3036.576 3.3 3199.779 3.4 3367.938 3.5 3541.125 3.6 3719.412 3.7 3902.871 3.8 4091.574 3.9 4285.593 4 4485 4.1 4689.867 4.2 4900.266 4.3 5116.269 4.4 5337.948 4.5 5565.375Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.