Which delivery system would you choose if the following was the main driver or c

ID: 1710438 • Letter: W

Question

Which delivery system would you choose if the following was the main driver or characteristic of the project. Why? (Answers should be short paragraphs)

a. Speed: A software manufacturer needs to start building a plant as soon as possible. They also want to be heavily involved in every design decision.  

b. Risk reduction: A group of doctors wants to build a small medical office building in east Boulder. They have zero experience managing a project and want to shed as much risk as possible. They are not particularly concerned with the details of the design.

c. Renovation with few trades: IBM is doing a renovation to their plant in Colorado. The work general involves only a few trades (mechanical and electrical). IBM has an in-house staff devoted to project management.

Explanation / Answer

Risk reduction.

Risk Reduction (DRR) aims to reduce the damage caused by natural hazards like earthquakes, floods, droughts and cyclones, through an ethic of prevention. Disasters often follow natural hazards.