1. ( problem 3.2 ) For the task graphs in the given abouve figure, determine the
ID: 674270 • Letter: 1
Question
1. ( problem 3.2 ) For the task graphs in the given abouve figure, determine the following :
a.) Maximum degree of concurrency
b.) Critial path length
c.) Maximum achievable speedup over one process assuming that an arbitrarily large
number of processes is available.
d.) The minimum number of processes needed to obtain the maximum possible speed
up.
e.) The maximum achievable speedup if the number of processes is limited to (a) 2, (b) 4, and c.) 8
) .
Explanation / Answer
Therefore for graph a) Maximum Degree of Concurrency is : 8
2)Critical Path Length: It is defined as the longest length in the graph.
Therefore for graph
Therefore for graph
Related Questions
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.