Dement is using a fix\'d- position layout project layout process layout geograph
ID: 458671 • Letter: D
Question
Dement is using a fix'd- position layout project layout process layout geographical layout customer-based layout employs specialized computer systems to actually guide and control the transformation process of inputs into outputs. Computer-assisted design (CAD) A transaction processing system Computer-assisted manufacturing (CAM) f). The in-basket technique A turnkey project Purchasing of all materials in organizations is also referred to as: consumption. leveraged buyout. acquisition. procurement, crowdsourcing. The term refers to all raw materials, components, completed or partially completed products and pieces of equipment a firm uses. inventory capital reserve input share F.. intangible Minimizing inventory by providing an almost continuous flow of items from suppliers to the production facility is referred to as: A. just-in-time inventory management. flexible scheduling. continuous manufacturing system. = 0.60 mg VSS/mg BOD5, determine: Hydraulic detention time in the pond Mass of microbes produced in the pond each dayExplanation / Answer
46.A. Fixed position Layout
47.C. Computer Aided Manufactiring (CAM)
48.D. Procurement
49.A.Inventory
50.Just In Time Manufactiring system.
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.