Question 1 (1 point) _____ is a mathematical theory for developing strategies th
ID: 455398 • Letter: Q
Question
Question 1 (1 point)
_____ is a mathematical theory for developing strategies that maximize gains and minimize losses while adhering to a given set of rules and constraints.
Question 1 options:
Parrondo's paradox
Bioinformatics
Game theory
Chainstore paradox
Save
Question 2 (1 point)
Pilot start-up involves running both the old and new systems for a period of time.
Question 2 options:
Save
Question 3 (1 point)
A _____ is a critical date for completing a major part of a project, such as program design, coding, testing, and cutover.
Question 3 options:
project milestone
project deadline
project schedule
project due-date
Save
Question 4 (1 point)
Which of these is an advantage of prototyping?
Question 4 options:
Users can try the system and provide constructive feedback during development.
Formal end-of-phase reviews take place systematically.
System documentation is always complete because the primary focus is on development of a prototype.
There is a lot of attention given to system backup and recovery, performance, and security.
Save
Question 5 (1 point)
The Pareto principle is also known as the _____.
Question 5 options:
result rule
cause rule
50-50 rule
80-20 rule
Save
Question 6 (1 point)
_____ is the creation, modification, or extension of software by people who are nonprofessional software developers.
Question 6 options:
Mobile application development
Object-oriented systems development
User-oriented systems development
End-user systems development
Save
Question 7 (1 point)
Expert systems, robotics, vision systems, natural language processing, learning systems, and neural networks are all part of the broad field of artificial intelligence.
Question 7 options:
Save
Question 8 (1 point)
_____ creates a complete set of technical specifications that can be used to construct an information system.
Question 8 options:
Systems design
Systems investigation
Systems analysis
Systems development
Save
Question 9 (1 point)
In the system construction phase, determining the specific equipment needed, ordering the equipment, and receiving the equipment require a short lead time.
Question 9 options:
Save
Question 10 (1 point)
The _____ stores all relevant information, data, rules, cases, and relationships that an expert system uses.
Question 10 options:
inference engine
knowledge base
user interface
data warehouse
Parrondo's paradox
Bioinformatics
Game theory
Chainstore paradox
Explanation / Answer
1.
Correct Answer:
Game Theory
Explanation:
It is a strategic approach to identify the best ways to take initiatives in the market. Thus, firms find an equilibrium position that suits them in best possible manner.
2.
Correct Answer:
False
In a given type of startup, only new system is used for a period of time. It is the parallel startup where both systems are used.
3.
Correct Answer:
Project Milestone
It is a very important date as far as the project is concerned. It is recognized as the date when an major part of project is completed.
4.
Correct Answer:
Users can try the system and provide constructive feedback during development.
It is the primary advantage of prototype.