Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

4.* Abbott Manufacturing produces plastic cases for solar photovoltaic panels an

ID: 402825 • Letter: 4

Question

4.* Abbott Manufacturing produces plastic cases for solar photovoltaic panels and has decided to combine orders from customers to increase work order size, and thereby make one large production run per model type. Plastic injection molding machines are used to make these parts and it is time consuming to clean and re-setup the machines between production runs. Each molding machine and operator works one nine-hour shift with a one-hour lunch break and one-half hour for operator breaks.


Consolidated Work Orders

Work Order Quantity

Setup (Changeover) Time per Work Order (Minutes)

Processing Time per Panel (Seconds)

Model XVT-5 Case

11,500

  panels

  90

2.15

Model UYT-3 Case

  6,500

  60

1.78

Model KLY-6 Case

  8,800

150

3.31


What is the total workload (demand) in hours for this work order mix? How many machines will it take to do this work in one, two, or three days? How might this process be improved?

Consolidated Work Orders

Work Order Quantity

Setup (Changeover) Time per Work Order (Minutes)

Processing Time per Panel (Seconds)

Model XVT-5 Case

11,500

  panels

  90

2.15

Model UYT-3 Case

  6,500

  60

1.78

Model KLY-6 Case

  8,800

150

3.31

Explanation / Answer

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote