Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

The system analysis and design project must be realistic and it will be done usi

ID: 3866182 • Letter: T

Question

The system analysis and design project must be realistic and it will be done using techniques covered in this course. The topic suggested for this project is as follows: Warehouse management system

2. The above list is meant to be suggestive and if you have an idea about a specific topic, please consult with me early to determine if it is suitable for the course. 3. You have to select and submit the project topic for instructor’s approval by the end of Week 2. Project Deliverables The project requires students to perform three phases: (a) requirements analysis, (b) system and database design, and (c) a project plan. Note that in the phase 3, students are required to use the MS Project software for their project schedule. The deadline for the Individual Project can be found in the schedule section of the class syllabus. The following layout format covering a title page and all three phases is recommended for the project. Title page (project name, author, and date) Phase 1: Requirement analysis A. Problem definition B. Issues C. Objectives D. Requirements E. Constraints F. Description of the proposed system G. Logical model design Data flow diagrams Context diagram Diagram 0 Diagram 1 (Diagram 1 is optional) Descriptions of processes in each diagram Descriptions of outputs/inputs/performance/security or controls H. Specific requirements, if any (interface, operational, resource, performance, etc.) Phase 2: System and database design A. User interface Design an overall user interface consisting of screens, commands, controls, and features to enable users to use the system. How data will be input to the system? The physical layout for each input The input design and procedures How data will be output from the system? The physical layout for each output The output design and procedures B. Data design Develop a plan for data organization, storage, updating, and retrieval. Database design Database tables with their attributes should be presented Primary key(s) should be identified in each table, if any Three steps of normalization should be included. Entity-relationship diagrams Data file storage and access C. System architecture Determine the architecture of the system as Web-based interface, client/server architecture, Internet/Intranet interface, network configuration, etc. Phase 3: Project plan A list of tasks or activities needed for implementing the proposed system Estimating completion time and costs A project schedule for performing those activities (Gantt charts or PERT charts) Note that there is no other required software package except the MS Project software in this ITEC-630 course. As a result, you are only required to use the MS Project software to handle the scheduling part of the project and for other parts, you can use any word editing software or any drawing tools software

Explanation / Answer

ware house management system, it is achain management of desired phases and plans and that to be implemented basicaaly it is a point between origin and consumption to satisfy the customer requirement.Every project is unique termilogy that arise the priority and resources assigned it,and environment in which it will operates, and the project manner attitude and style used to guide and control project activities. Therefore, the organizational structure for the project must be designed to fit that project's operating constraint. The organizational structure that is implemented may not be the same structure used throughout the life cycle of the project due to changes in priorities, available resource, project personnel, laws, and other contingencies. Therefore the project management structure chosen, management must realize that a dynamic and static state of equilibrium between limited personnel and financial resources and the objectives of the project will be necessary if project management is to be successful in their particular organization.when we use major tools and techniques of project management, and techniques of project management bring to the systems analysis process. every activity for an organization could be labeled as a project possessing that is unique characteristics and varying levels of importance to the organization. A project is defined as a related activities to reach an objective that has a beginning and an end. All major projects solve some type of problem, but many projects may also established simplyand to determine that is define feasible alternative solutions to problems. Seven primary characteristics of a project include:objective and scheduled.

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote