Given the project network and baseline information below, complete the form to d

ID: 381471 • Letter: G

Question

Given the project network and baseline information below, complete the form to develop a status report for the project at the end of period 4 and the end of period 8

LEGEND ES ID EF SL LS DUR LF SL 8 D 12 2 68 8412 12 F15 0 12 315 0 0 7 E10 93 12 Time Period TaskDUR ES LF SL Budget (PV) 1 2 3 45 6 78 9 10 11 12 13 14 15 410 2500 1510 1610 900 600 0 00 700 200 600 200 600 00 400 500 110 300 4 12 12 15 410 400 400 400 300 400 200 12 200 100 300 Period PV total 2002104001,100 700 710 500 900 810 600 400 400 200 100 300 Cumulative PV total 2004108101,9102,6103,3203,8204,7205,5306,1306,5306,9307,1307,2307,530 (Do not round intermediate calculations.) End of Period 4 Task Actual % Complete EV AC PV CV SV 300 900 500 Finished 30 Cumulative Totals

Explanation / Answer

The formulae and method are shown above the table.

End of week 4:

End of Week 8:

A A*PV Sum till end of week 4 PV-AC PV-EV Task Dur ES LF SL Budget(PV) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 AC % complete EV AC PV CV SV A 410 200 210 100% 410 300 410 110 0 B 2500 200 700 200 600 200 600 50% 450 900 900 0 450 C 1510 200 400 500 110 300 30% 180 500 600 100 420 D 1610 410 400 400 400 0% 0 0 0 0 0 E 900 300 400 200 0% 0 0 0 0 0 F 600 200 100 300 0% 0 0 0 0 0 Period PV 200 210 400 1100 700 710 500 900 810 600 400 400 200 100 300 Cumm Total 1040 1700 1910 210 870 Cummulative PV 200 410 810 1910 2610 3320 3820 4720 5530 6130 6530 6930 7130 7230 7530