Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

for each activity 15) The work breakdown structure involves identifying the A) t

ID: 363745 • Letter: F

Question

for each activity 15) The work breakdown structure involves identifying the A) time B) cost C) resource requirements D) predecessors E) All of the above 16) PERT stands for A) probabilistic evaluation and review technique. B) program evaluation and review technique. C) probability of expected run times. D) program of expected run times. 17) CPM stands for A) critical path management. B) critical project management. C) critical project method. D) critical path method. 18) The project described by: Time Immediate Activity Predecessordays) B, C has a critical path of length cf A) 15 days. B) 20 days. C) 17 days D) 18 days. Table 11-4 The following represents a project with known activity times. All times are in weeks. Immediate vit PredecesOE Time C, D E, F

Explanation / Answer

The correct option is E that is all of above. Work breakdown structure basically defines the work required to produce products. It can resembles with flow chart which shows important elemnet’s interconnection so that no important element left.

16) PERT stands for program evaluation and review technique. OPTION B is correct. It is a tool used in project management which analyze the tasks included in completing the given project.

17) CPM stands for critical path method. OPTION D is correct. It is step by step project management technique for process plannning. It also defines the critical and non critical tasks with goal of preventing process bottlenecks.

18) OPTION B is correct.