11. Which of the following objectives is more important in a pull system? ______

ID: 363423 • Letter: 1

Question

11. Which of the following objectives is more important in a pull system? _________

Producing at the rate of demand

Keeping the equipment utilization

12. If other things remain the same, what happens to the number of Kanban cards in the process if the replenishment time goes up? ___________

The number of kanban cards increases.

The number of kanban cards stays the same.

The number of kanban cards decreases.

Cannot determine from the given information

You measure the exact size of 100 ping pong balls from manufacturer A and then another 100 balls from manufacturer B. The balls of manufacturer B have a much larger variation. Means and specification limits for the two manufacturers are identical. Which of the two manufacturers has a higher process capability index? ______________

Manufacturer A

Manufacturer B

Cannot be determined from the given information

Explanation / Answer

Que 11

Answer should be

Producing at the rate of demand

Because pull system is when you start producing the product as per the increase in the demand in market   

Que 12

Answer should be

The number of Kanban cards increases

Because that way the Kanban cards process can increase the production

Que 13

Answer should be

Manufacturer A

Because Manufacturer A has consistent production rate than Manufacturer B